MBTA CRRC 1400
MBTA CRRC 1400
In late 2008, the MBTA began the planning process for new Orange and Red Line vehicles. The agency originally planned for a simultaneous order for 146 Orange Line cars (to replace the whole fleet) and 74 Red Line cars (to replace the older 1500 and 1600 series cars). A similar order was used in the late 1970s for the current Orange Line cars and the old Blue Line cars, ordered at the same time and largely identical except for size and color. In October 2013, MassDOT announced plans for a $1.3 billion subway car order for the Orange and Red Lines, which would provide 152 new Orange Line cars to replace the existing 120-car fleet and add more frequent service.
Include
CRRC 1400 Orange Line
Asset
Specification
Max Speed: 101 km/h
Engine type: Diesel
Power: 600 kW
Tractive effort: 25 kN
Capacity: 38
Emission: 66
Weight: 56 t
Build date: 2019
Lifespan: 50 years
Price: from $4.510.730
Maint/year: from $751.788
Note
If you’re asking about increasing capacity like in real life, I’m really sorry because I will not change it due to in-game balancing. Just a fact in transport fever, 1 capacity equals 4 people. If you want to increase it like in real life, feel free to use real capacity mod from another modder. Thank you!
This mod contains a high number of tris, it can cause lags when the train is highlighted. Use at your own discretion!